🪙 Cost-Benefit-Analysis-in-Steel-Manufacturing-using-Excel-VBA

This repository contains an advanced Excel-VBA driven financial analysis tool to evaluate annealing line investment improving narrow-width coil processing in a steel manufacturing facility


💰 Cost Benefit Analysis

Every solution should be evaluated on the cost to implement it and the benefits realized from it

Net Present Value (NPV)

NPV takes the initial costs and expected net benefits of each solution and converts them into present day dollars

  •         Profitability = NPV (Net Benefits) - Initial Cost
    

Internal Rate of Return (IRR)

It is the discounted rate wehre NPV = 0. If the value is less than cost of capital, solution is not implemented due to benefit constraints

Solution Screening

  • It is a theoritical approach
  • It is evaluated using Cost and Benefit Analysis
  • The test is prioritized from brainstorming exercises
  • It is screened with potential success with Piloting

Piloting

Piloting is a technique for deploying solution or change in small teams or groups. It is used to deploy solution to:

  • 10% of entire scope
  • 40% of entire scope
  • Remaining 50% of the entire scope

Pilot Validation

At each phase in the pilot:-

flowchart TD;
A[Post-improvement data] <--> |Paired t-test for one week| B[Pre-improvement data];
Loading

The paired t-test should check

flowchart TD;
A[Has x̄ changed significantly] --> |Yes| B[Has output variable performance changed] --> |Yes| C[Commence next piloting phase] --> |A month after full implementation| D[Is the change effective? Revalidate with a paired t-test];
Loading

💷 Case study: Investment evaluation in Automated Annealing line

Business scenario

A steel manufacturer wants to improve profitability during the current quarter by investing in a semi-automated annealing line. The proposal includes:

  • Initial investment: INR 60,00,000
  • Expected savings (Quarterly) : INR 8,00,000 over 3 years (12 quarters)
  • Residual value: INR 5,00,000 after 3 years
  • Discount rate: 12%

Objective

Assess the investment using

  • Cost-Benefit ratio
  • NPV
  • IRR
  • Run a solution screening matrix
  • Simulate pilot outcomes

Solution Screening Matrix

In a Steel Manufacturing setup, Step 1: List all evaluation criteria**

  • Durability Impact
  • Cost Efficiency
  • Implementation Time
  • Payback speed
  • Environmental Compliance

Step 2: Use a 100-point allocation method (Most common)

  1. Assign 100 total points across all criteria based on their importance
  2. More important criteria get more points
  3. Normalize them to add up to 1 or 100%
Criteria Raw Score Weight(normalized)
Durability impact 30 0.3
Cost Efficiency 20 0.2
Implementation Time 15 0.15
Payback speed 25 0.25
Environmental Impact 10 0.1
Total 100 1.00

Step 3: Validate through stakeholders

  1. Ask team members to suggest scores
  2. Take average or consensus to finalize the weights

VBA Code for analysis

  •       Sub Steel_Profitability_Analysis_With_Screening_And_Pilot()
    
          Dim ws As Worksheet
          Dim weights() As Double
          Dim j As Integer
    
          ' Sheet setup
          On Error Resume Next
          Application.DisplayAlerts = False
          Worksheets("Steel_Analysis").Delete
          Application.DisplayAlerts = True
          On Error GoTo 0
          Set ws = ThisWorkbook.Sheets.Add
          ws.Name = "Steel_Analysis"
    
          Dim cashFlows(1 To 13) As Double ' 12 quarters + residual
          Dim i As Integer
    
          ' Inputs
          Dim initialInvestment As Double: initialInvestment = 6000000
          Dim quarterlySavings As Double: quarterlySavings = 800000
          Dim residualValue As Double: residualValue = 500000
          Dim discountRate As Double: discountRate = 0.12 / 4 'quarterly
    
          ' Populate cash flows
          For i = 1 To 12
              cashFlows(i) = quarterlySavings
          Next i
              cashFlows(13) = residualValue
    
          ' Write to sheet
          ws.Range("A1").Value = "Quarter"
          ws.Range("B1").Value = "Cash Flow"
          For i = 1 To 13
              ws.Cells(i + 1, 1).Value = "Q" & i
              ws.Cells(i + 1, 2).Value = cashFlows(i)
          Next i
          ws.Range("A15").Value = "Initial Investment"
          ws.Range("B15").Value = -initialInvestment
    
          ' Calculate NPV
          Dim npv As Double
              npv = -initialInvestment
          For i = 1 To 13
              npv = npv + cashFlows(i) / ((1 + discountRate) ^ i)
          Next i
    
          ' Write NPV
          ws.Range("A16").Value = "Net Present Value (NPV)"
          ws.Range("B16").Value = npv
    
          ' Calculate IRR using built-in function
          Dim cashArray() As Double
          ReDim cashArray(0 To 13)
                cashArray(0) = -initialInvestment
          For i = 1 To 13
                cashArray(i) = cashFlows(i)
          Next i
    
          Dim irrVal As Double
          On Error Resume Next
          irrVal = WorksheetFunction.IRR(cashArray)
          On Error GoTo 0
    
          ws.Range("A17").Value = "Internal Rate of Return (IRR)"
          ws.Range("B17").Value = Format(irrVal * 100, "0.00") & "%"
    
          ' Cost-Benefit ratio
          Dim totalBenefit As Double: totalBenefit = Application.WorksheetFunction.Sum(cashArray)
          Dim cbr As Double: cbr = totalBenefit / initialInvestment
    
              ws.Range("A18").Value = "Cost-Benefit Ratio"
              ws.Range("B18").Value = Format(cbr, "0.00")
    
          ' Piloting ROI
          ws.Range("D1").Value = "Pilot Simulation"
          ws.Range("D2").Value = "Q1 ROI"
          ws.Range("D3").Value = Format(cashFlows(1) / initialInvestment, "0.00%")
          ws.Range("D4").Value = "Q1+Q2 ROI"
          ws.Range("D5").Value = Format((cashFlows(1) + cashFlows(2)) / initialInvestment, "0.00%")
          ws.Range("D6").Value = "Q1+Q2+Q3 ROI"
          ws.Range("D7").Value = Format((cashFlows(1) + cashFlows(2) + cashFlows(3)) / initialInvestment, "0.00%")
    
          ' Solution Screening Matrix
          Dim criteria As Variant, options As Variant, rawScores As Variant
          criteria = Array("Durability", "Cost Efficiency", "Implementation Time", "Payback Speed")
          options = Array("Option A", "Option B", "Option C")
          rawScores = Array(30, 20, 20, 30) ' User-definred raw weights
    
          ReDim weights(1 To UBound(rawScores) + 1)
          Dim totalWeight As Double
                For i = 0 To UBound(rawScores)
                  totalWeight = totalWeight + rawScores(i)
                Next i
    
                For i = 0 To UBound(rawScores)
                  weights(i + 1) = rawScores(i) / totalWeight
                Next i
    
          ' Write screening table header
            ws.Range("F1").Value = "Criteria"
            ws.Range("G1").Value = "Weight"
              For j = 0 To UBound(options)
                  ws.Cells(1, 8 + j).Value = options(j)
              Next j
    
          ' Criteria weights and scores
            Dim scores(1 To 4, 1 To 3)
            scores(1, 1) = 3: scores(1, 2) = 4: scores(1, 3) = 2
            scores(2, 1) = 2: scores(2, 2) = 4: scores(2, 3) = 3
            scores(3, 1) = 4: scores(3, 2) = 3: scores(3, 3) = 5
            scores(4, 1) = 3: scores(4, 2) = 4: scores(4, 3) = 2
            
            For i = 1 To 4
                ws.Cells(i + 1, 6).Value = criteria(i - 1)
                ws.Cells(i + 1, 7).Value = weights(i)
                For j = 1 To 3
                    ws.Cells(i + 1, 7 + j).Value = scores(i, j)
                Next j
            Next i
            
            ' Weighted Total
            ws.Cells(6, 6).Value = "Total Score"
            For j = 1 To 3
                Dim totalScore As Double
                totalScore = 0
                For i = 1 To 4
                    totalScore = totalScore + (scores(i, j) * weights(i))
                Next i
                ws.Cells(6, 7 + j).Value = Format(totalScore, "0.00")
            Next j
            
            MsgBox "All financials, screening, and pilot evaluation completed!"
            
        End Sub
    

💴 Excel Functionalities used

  • Visual Basic Editor
  • NPV()
  • IRR()
  • SUM()
  • SUMPRODUCT()

💳 Requirements

  • Microsoft Excel 2016 or later
  • Fundamentals of Financial analysis

"WIth everything in business, the benefits gained should exceed the cost incurred"

About

This repository contains an advanced Excel-VBA driven financial analysis tool to evaluate **annealing line investment** improving **narrow-width coil processing** in a steel manufacturing facility

Topics

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

 
 
 

Contributors